×
Log in Upload File
- Most Popular
- Study
- Business
- Design
- Technology
- Travel
- Explore all categories
- Home
- Documents
- AUSLEY McMULLEN· ausley mcmullen attorneys and counselors at law 123 south calhoun street p.o. box 391 (zip 32302) tallahassee, florida 32301 (850) 224-9115 fax (850) 222-7560
20
AUSLEY McMULLEN ATTORNEYS AND COUNSELORS AT LAW 123 SOUTH CALHOUN STREET P.O. BOX 391 (ZIP 32302) TALLAHASSEE , FLORIDA 32301 (850) 224-9115 FAX (850) 222-7560 March 27, 2017 ELECTRONIC FILING Ms. Carlotta Stauffer, Director Office of Commission Clerk Florida Public Service Commission 2540 Shumard Oak Boulevard Tallahassee, FL 32399-0850 Re: Fuel and Purchased Power Cost Recovery Clause with Generating Performance Incentive Factor FPSC Docket No. 170001-EI Dear Ms. Stauffer: Attached for filing in the above docket are Tampa Electric Company's Schedules A1 - A9 & A12 for the month of February 2017. Thank you for your assistance in connection with this matter. JDB/ne Attachment cc: All Parties ofRecord (w/attachment) Michael Barrett (w/attachment) Sincerely,
Upload: others
Post on 20-Jan-2020
4 views
Category:
Documents
0 download
Report
- Download
TRANSCRIPT
AUSLEY McMULLEN ATTORNEYS AND COUNSELORS AT LAW
123 SOUTH CALHOUN STREET
P.O. BOX 391 (ZIP 32302)
TALLAHASSEE , FLORIDA 32301
(850) 224-9115 FAX (850) 222-7560
March 27, 2017 ELECTRONIC FILING
Ms. Carlotta Stauffer, Director Office of Commission Clerk Florida Public Service Commission 2540 Shumard Oak Boulevard Tallahassee, FL 32399-0850
Re: Fuel and Purchased Power Cost Recovery Clause with Generating Performance Incentive Factor FPSC Docket No. 170001-EI
Dear Ms. Stauffer:
Attached for filing in the above docket are Tampa Electric Company's Schedules A1 - A9 & A12 for the month of February 2017.
Thank you for your assistance in connection with this matter.
JDB/ne Attachment cc: All Parties ofRecord (w/attachment)
Michael Barrett (w/attachment)
Sincerely,
FPSC Commission Clerk
FILED MAR 27, 2017 DOCUMENT NO. 03826-17 FPSC - COMMISSION CLERK
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that a true and correct copy of the foregoing Schedules, filed on
behalf of Tampa Electric Company, has been furnished by electronic mail on this 27th day of March
2017 to the following:
Ms. Suzanne Brownless Office ofthe General Counsel Florida Public Service Commission 2540 Shumard Oak Boulevard Tallahassee, FL 32399-0850 [emailprotected]
Ms. Patricia A. Christensen Associate Public Counsel Office of Public Counsel 111 West Madison Street - Room 812 Tallahassee, FL 32399-1400 christensen. [emailprotected]. us
Ms. Dianne M. Triplett Duke Energy Florida, Inc. 299 First Avenue North St. Petersburg, FL 33701 Dianne. [emailprotected]
Mr. Matthew R. Bernier Senior Counsel Duke Energy Florida, Inc. 106 East College A venue, Suite 800 Tallahassee, FL 32301-7740 [emailprotected]
Mr. Jon C Moyle, Jr. Moyle Law Firm 118 North Gadsden Street Tallahassee, FL 32301 [emailprotected]
Mr. Robert L. McGee, Jr. Regulatory and Pricing Manager Gulf Power Company One Energy Place Pensacola, FL 32520-0780 [emailprotected]
2
Ms. Beth Keating Gunster, Y oakley & Stewart, P .A. 215 S. Monroe St., Suite 60 1 Tallahassee, FL 32301 [emailprotected]
Mr. John T. Butler Assistant General Counsel - Regulatory Florida Power & Light Company 700 Universe Boulevard (LAW/JB) Juno Beach, FL 33408-0420 john. [emailprotected]
Mr. Kenneth Hoffman Vice President, Regulatory Relations Florida Power & Light Company 215 South Monroe Street, Suite 810 Tallahassee, FL 32301-1859 [emailprotected]
Mr. Mike Cassel Regulatory and Governmental Affairs Florida Public Utilities Company Florida Division of Chesapeake Utilities Corp. 1750 SW 14th Street, Suite 200 Fernandina Beach, FL 32034 [emailprotected]
Mr. Jeffrey A. Stone Mr. Russell A. Badders Mr. Steven R. Griffin Beggs & Lane Post Office Box 12950 Pensacola, FL 32591-2950 [emailprotected] [emailprotected] [emailprotected]
Mr. Robert Scheffel Wright Mr. John T. La Via, III Gardner, Bist, Wiener, Wadsworth,
Bowden, Bush, Dee, La Via & Wright, P.A. 1300 Thomaswood Drive Tallahassee, FL 32308 [emailprotected] [emailprotected]
3
Mr. James W. Brew Ms. Laura A. Wynn Stone Mattheis Xenopoulos & Brew, PC 1025 Thomas Jefferson Street, NW Eighth Floor, West Tower Washington, D.C. 20007-5201 [emailprotected] [emailprotected]
ATf ORNEY
TAMPA ELECTRIC
1. Schedule A1- A9 & A12
2. List of Acronyms
TAMPA ELECTRIC COMPANY
TABLE OF CONTENTS
February 2017
TAMPA ELECTRIC COMPANY DOCKET NO. 170001-EI
15 Pages
1 Page
COMPARISON OF ESTIMATED AND ACTUALFUEL AND PURCHASED POWER COST RECOVERY FACTOR
TAMPA ELECTRIC COMPANY
$ DIFFERENCE MWH DIFFERENCE CENTS/KWH DIFFERENCE
ACTUAL ESTIMATED AMOUNT % ACTUAL ESTIMATED AMOUNT % ACTUAL ESTIMATED AMOUNT %
1. Fuel Cost of System Net Generation (A3) 41,298,238 42,680,487 (1,382,249) -3.2% 1,262,662 1,281,000 (18,338) -1.4% 3.27073 3.33181 (0.06108) -1.8%
2. Spent Nuclear Fuel Disposal Cost 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
3. Coal Car Investment 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
4a. Adjustments - Big Bend Units 1-4 Igniters Conversion Project 450,036 450,036 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
4b. Adjustments - Polk 1 Conversion Depreciation & ROI 302,253 302,253 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
4c. Adjustments - Polk Warm Gas Cleanup 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
5. TOTAL COST OF GENERATED POWER (Lines 1 through 4c) 42,050,527 43,432,776 (1,382,249) -3.2% 1,262,662 1,281,000 (18,338) -1.4% 3.33031 3.39054 (0.06023) -1.8%
6. Fuel Cost of Purchased Power - Firm (A7) 223,553 0 223,553 0.0% 5,981 0 5,981 0.0% 3.73772 0.00000 3.73772 0.0%
7. Energy Cost of Sch C,X Econ. Purch. (Broker) (A9) 704,507 829,340 (124,833) -15.1% 23,878 26,580 (2,702) -10.2% 2.95044 3.12017 (0.16972) -5.4%
8. Energy Cost of Other Econ. Purch. (Non-Broker) (A9) 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
9. Energy Cost of Sch. E Economy Purchases (A9) 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
10. Capacity Cost of Sch. E Economy Purchases 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
11. Payments to Qualifying Facilities (A8) 344,155 220,310 123,845 56.2% 16,644 7,440 9,204 123.7% 2.06774 2.96116 (0.89341) -30.2%
12. TOTAL COST OF PURCHASED POWER (Lines 6 through 11) 1,272,215 1,049,650 222,565 21.2% 46,503 34,020 12,483 36.7% 2.73577 3.08539 (0.34962) -11.3%
13. TOTAL AVAILABLE KWH (LINE 5 + LINE 12) 1,309,165 1,315,020 (5,855) -0.4%
14. Fuel Cost of Sch. D Jurisd. Sales (A6) 4,702 19,060 (14,358) -75.3% 232 680 (448) -65.9% 2.02672 2.80294 (0.77622) -27.7%
15. Fuel Cost of Sch. C/CB Sales (A6) 104,155 0 104,155 0.0% 5,156 0 5,156 0.0% 2.02007 0.00000 2.02007 0.0%
16. Fuel Cost of OATT Sales (A6) 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
17. Fuel Cost of Market Base Sales (A6) 90,529 26,679 63,850 239.3% 4,563 990 3,573 360.9% 1.98398 2.69485 (0.71087) -26.4%
18. Gains on Sales 16,268 3,405 12,863 377.8%
19. TOTAL FUEL COST AND GAINS OF POWER SALES 215,654 49,144 166,510 338.8% 9,951 1,670 8,281 495.9% 2.16716 2.94275 (0.77560) -26.4%
(LINE 14 + 15 + 16 + 17 + 18)
20. Net Inadvertant Interchange (292) 0 (292) 0.0%
21. Wheeling Rec'd. less Wheeling Delv'd. 1,567 0 1,567 0.0%
22. Interchange and Wheeling Losses 1,721 (14) 1,735 -12006.7%
23. TOTAL FUEL AND NET POWER TRANSACTIONS 43,107,088 44,433,282 (1,326,194) -3.0% 1,298,768 1,313,364 (14,596) -1.1% 3.31908 3.38316 (0.06409) -1.9%
(LINE 5 + 12 - 19 + 20 + 21 - 22)
24. Net Unbilled (2,116,840) (a) (2,477,356) (a) 360,516 -14.6% (63,778) (73,226) 9,448 -12.9% 3.31908 3.38316 (0.06409) -1.9%
25. Company Use 88,818 (a) 96,420 (a) (7,602) -7.9% 2,676 2,850 (174) -6.1% 3.31906 3.38316 (0.06410) -1.9%
26. T & D Losses 2,142,297 (a) 1,962,961 (a) 179,336 9.1% 64,545 58,021 6,524 11.2% 3.31908 3.38316 (0.06409) -1.9%
27. System KWH Sales 43,107,088 44,433,282 (1,326,194) -3.0% 1,295,325 1,325,719 (30,394) -2.3% 3.32790 3.35164 (0.02374) -0.7%
28. Wholesale KWH Sales 0 (2,733) 2,733 -100.0% 0 (80) 80 -100.0% 0.00000 3.41625 (3.41625) -100.0%
29. Jurisdictional KWH Sales 43,107,088 44,430,549 (1,323,461) -3.0% 1,295,325 1,325,639 (30,314) -2.3% 3.32790 3.35163 (0.02374) -0.7%
30. Jurisdictional Loss Multiplier 1.00000 1.00002 (0.00002) 0.0%
31. Jurisdictional KWH Sales Adjusted for Line Losses 43,107,088 44,431,438 (1,324,350) -3.0% 1,295,325 1,325,639 (30,314) -2.3% 3.32790 3.35170 (0.02380) -0.7%
32. Adjustment-December 2016 Jurisdic Loss Multiplier (16) 0 (16) 0.0% 1,295,325 1,325,639 (30,314) -2.3% (0.00000) 0.00000 (0.00000) 0.0%
33. True-up * (10,219,983) (10,219,983) 0 0.0% 1,295,325 1,325,639 (30,314) -2.3% (0.78899) (0.77095) (0.01804) 2.3%
34. Total Jurisdictional Fuel Cost (Excl. GPIF) 32,887,089 34,211,455 (1,324,366) -3.9% 1,295,325 1,325,639 (30,314) -2.3% 2.53891 2.58075 (0.04185) -1.6%
35. Revenue Tax Factor 1.00072 1.00072 0.00000 0.0%
36. Fuel Cost Adjusted for Taxes (Excl. GPIF) 32,910,768 34,236,087 (1,325,319) -3.9% 1,295,325 1,325,639 (30,314) -2.3% 2.54073 2.58261 (0.04188) -1.6%
37. GPIF * (Already Adjusted for Taxes) 80,799 80,799 0 0.0% 1,295,325 1,325,639 (30,314) -2.3% 0.00624 0.00610 0.00014 2.3%
38. Fuel Cost Adjusted for Taxes (Incl. GPIF) 32,991,567 34,316,886 (1,325,319) -3.9% 1,295,325 1,325,639 (30,314) -2.3% 2.54697 2.58871 (0.04174) -1.6%
39. Fuel FAC Rounded to the Nearest .001 cents per KWH 2.547 2.589 (0.042) -1.6%
* Based on Jurisdictional Sales (a) included for informational purposes only
SCHEDULE A1PAGE 1 OF 2
MONTH OF: February 2017
1
COMPARISON OF ESTIMATED AND ACTUALFUEL AND PURCHASED POWER COST RECOVERY FACTOR
TAMPA ELECTRIC COMPANY
PERIOD TO DATE THROUGH: February 2017
$ DIFFERENCE MWH DIFFERENCE CENTS/KWH DIFFERENCE
ACTUAL ESTIMATED AMOUNT % ACTUAL ESTIMATED AMOUNT % ACTUAL ESTIMATED AMOUNT %
1. Fuel Cost of System Net Generation (A3) 90,244,716 91,529,878 (1,285,162) -1.4% 2,723,357 2,729,850 (6,493) -0.2% 3.31373 3.35293 (0.03920) -1.2%
2. Spent Nuclear Fuel Disposal Cost 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
3. Coal Car Investment 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
4a. Adjustments - Big Bend Units 1-4 Igniters Conversion Project 902,665 902,665 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
4b. Adjustments - Polk 1 Conversion Depreciation & ROI 606,508 606,508 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
4c. Adjustments - Polk Warm Gas Cleanup 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
5. TOTAL COST OF GENERATED POWER (Lines 1 through 4c) 91,753,889 93,039,051 (1,285,162) -1.4% 2,723,357 2,729,850 (6,493) -0.2% 3.36915 3.40821 (0.03906) -1.1%
6. Fuel Cost of Purchased Power - Firm (A7) 559,957 0 559,957 0.0% 16,057 0 16,057 0.0% 3.48731 0.00000 3.48731 0.0%
7. Energy Cost of Sch C,X Econ. Purch. (Broker) (A9) 751,567 1,576,180 (824,613) -52.3% 25,298 50,420 (25,122) -49.8% 2.97086 3.12610 (0.15525) -5.0%
8. Energy Cost of Other Econ. Purch. (Non-Broker) (A9) 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
9. Energy Cost of Sch. E Economy Purchases (A9) 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
10. Capacity Cost of Sch. E Economy Purchases 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
11. Payments to Qualifying Facilities (A8) 755,653 486,050 269,603 55.5% 36,176 14,980 21,196 141.5% 2.08882 3.24466 (1.15584) -35.6%
12. TOTAL COST OF PURCHASED POWER (Lines 6 through 11) 2,067,177 2,062,230 4,947 0.2% 77,531 65,400 12,131 18.5% 2.66626 3.15326 (0.48700) -15.4%
13. TOTAL AVAILABLE KWH (LINE 5 + LINE 12) 2,800,888 2,795,250 5,638 0.2%
14. Fuel Cost of Sch. D Jurisd. Sales (A6) 10,293 41,650 (31,357) -75.3% 508 1,480 (972) -65.7% 2.02618 2.81419 (0.78801) -28.0%
15. Fuel Cost of Sch. C/CB Sales (A6) 159,580 0 159,580 0.0% 7,678 0 7,678 0.0% 2.07841 0.00000 2.07841 0.0%
16. Fuel Cost of OATT Sales (A6) 0 0 0 0.0% 0 0 0 0.0% 0.00000 0.00000 0.00000 0.0%
17. Fuel Cost of Market Base Sales (A6) 355,614 51,467 304,147 591.0% 15,559 1,930 13,629 706.2% 2.28558 2.66668 (0.38110) -14.3%
18. Gains on Sales 101,530 6,757 94,773 1402.6%
19. TOTAL FUEL COST AND GAINS OF POWER SALES 627,017 99,874 527,143 527.8% 23,745 3,410 20,335 596.3% 2.64063 2.92886 (0.28823) -9.8%
(LINE 14 + 15 + 16 + 17 + 18)
20. Net Inadvertant Interchange (192) 0 (192) 0.0%
21. Wheeling Rec'd. less Wheeling Delv'd. 1,961 0 1,961 0.0%
22. Interchange and Wheeling Losses 2,328 (28) 2,356 -8361.8%
23. TOTAL FUEL AND NET POWER TRANSACTIONS 93,194,049 95,001,407 (1,807,358) -1.9% 2,776,584 2,791,868 (15,284) -0.5% 3.35643 3.40279 (0.04636) -1.4%
(LINE 5 + 12 - 19 + 20 + 21 - 22)
24. Net Unbilled (5,399,131) (a) (5,398,945) (a) (186) 0.0% (160,622) (158,647) (1,975) 1.2% 3.36139 3.40312 (0.04173) -1.2%
25. Company Use 186,327 (a) 193,896 (a) (7,569) -3.9% 5,553 5,700 (147) -2.6% 3.35543 3.40168 (0.04625) -1.4%
26. T & D Losses 5,410,149 (a) 5,269,384 (a) 140,765 2.7% 160,963 154,694 6,269 4.1% 3.36111 3.40632 (0.04521) -1.3%
27. System KWH Sales 93,194,049 95,001,407 (1,807,358) -1.9% 2,770,690 2,790,121 (19,431) -0.7% 3.36357 3.40492 (0.04135) -1.2%
28. Wholesale KWH Sales 0 (12,326) 12,326 -100.0% 0 (360) 360 -100.0% 0.00000 3.42389 (3.42389) -100.0%
29. Jurisdictional KWH Sales 93,194,049 94,989,081 (1,795,032) -1.9% 2,770,690 2,789,761 (19,071) -0.7% 3.36357 3.40492 (0.04135) -1.2%
30. Jurisdictional Loss Multiplier - - 0.00000 0.0%
31. Jurisdictional KWH Sales Adjusted for Line Losses 93,194,049 94,990,981 (1,796,932) -1.9% 2,770,690 2,789,761 (19,071) -0.7% 3.36357 3.40499 (0.04142) -1.2%
32. Other (9,641) 0 (9,641) 0.0% 2,770,690 2,789,761 (19,071) -0.7% (0.00035) 0.00000 (0.00035) 0.0%
33. True-up * (20,439,966) (20,439,966) 0 0.0% 2,770,690 2,789,761 (19,071) -0.7% (0.73772) (0.73268) (0.00504) 0.7%
34. Total Jurisdictional Fuel Cost (Excl. GPIF) 72,744,442 74,551,015 (1,806,573) -2.4% 2,770,690 2,789,761 (19,071) -0.7% 2.62550 2.67231 (0.04681) -1.8%
35. Revenue Tax Factor 1.00072 1.00072 0.00000 0.0%
36. Fuel Cost Adjusted for Taxes (Excl. GPIF) 72,796,818 74,604,691 (1,807,873) -2.4% 2,770,690 2,789,761 (19,071) -0.7% 2.62739 2.67423 (0.04684) -1.8%
37. GPIF * (Already Adjusted for Taxes) 161,598 161,598 0 0.0% 2,770,690 2,789,761 (19,071) -0.7% 0.00583 0.00579 0.00004 0.7%
38. Fuel Cost Adjusted for Taxes (Incl. GPIF) 72,958,416 74,766,289 (1,807,873) -2.4% 2,770,690 2,789,761 (19,071) -0.7% 2.63322 2.68002 (0.04680) -1.7%
39. Fuel FAC Rounded to the Nearest .001 cents per KWH 2.633 2.680 (0.047) -1.8%
* Based on Jurisdictional Sales (a) included for informational purposes only
SCHEDULE A1PAGE 2 OF 2
2
CURRENT MONTH PERIOD TO DATEDIFFERENCE DIFFERENCE
AMOUNT % AMOUNT %
A. FUEL COST & NET POWER TRANSACTION
1. FUEL COST OF SYSTEM NET GENERATION 41,298,238 42,680,487 (1,382,249) -3.2% 90,244,716 91,529,878 (1,285,162) -1.4%
1a. FUEL REL. R & D AND DEMO. COST 0 0 0 0.0% 0 0 0 0.0%
2. FUEL COST OF POWER SOLD 199,386 45,739 153,647 335.9% 525,487 93,117 432,370 464.3%
2a. GAINS FROM SALES 16,268 3,405 12,863 377.8% 101,530 6,757 94,773 1402.6%
3. FUEL COST OF PURCHASED POWER 223,553 0 223,553 0.0% 559,957 0 559,957 0.0%
3a. DEMAND & NONFUEL COST OF PUR. PWR. 0 0 0 0.0% 0 0 0 0.0%
3b. PAYMENT TO QUAL FIED FACILITIES 344,155 220,310 123,845 56.2% 755,653 486,050 269,603 55.5%
4. ENERGY COST OF ECONOMY PURCHASES 704,507 829,340 (124,833) -15.1% 751,567 1,576,180 (824,613) -52.3%
5. TOTAL FUEL & NET POWER TRANSACTION 42,354,799 43,680,993 (1,326,194) -3.0% 91,684,876 93,492,234 (1,807,358) -1.9%
6a. ADJ. - BIG BEND UNITS 1-4 IGNITERS CONVERSION PROJECT 450,036 450,036 0 0.0% 902,665 902,665 0 0.0%
6b. ADJ. - POLK 1 CONVERSION DEPRECIATION & ROI 302,253 302,253 0 0.0% 606,508 606,508 0 0.0%
6c. ADJ. - POLK WARM GAS CLEANUP 0 0 0 0.0% 0 0 0 0.0%
7. ADJUSTED TOTAL FUEL & NET PWR.TRANS. 43,107,088 44,433,282 (1,326,194) -3.0% 93,194,049 95,001,407 (1,807,358) -1.9%
B. MWH SALES
1. JURISDICTIONAL SALES 1,295,325 1,325,639 (30,314) -2.3% 2,770,690 2,789,761 (19,071) -0.7%
2. NONJURISDICTIONAL SALES 0 80 (80) -100.0% 0 360 (360) -100.0%
3. TOTAL SALES 1,295,325 1,325,719 (30,394) -2.3% 2,770,690 2,790,121 (19,431) -0.7%
4. JURISDIC. SALES-% TOTAL MWH SALES 1 0000000 0 9999385 0.0000615 0.0% - - 0.0000000 0.0%
ACTUAL ESTIMATED ACTUAL ESTIMATED
SCHEDULE A2PAGE 1 OF 3
MONTH OF February 2017
CALCULATION OF TRUE-UP AND INTEREST PROVISIONTAMPA ELECTRIC COMPANY
3
CURRENT MONTH PERIOD TO DATEDIFFERENCE DIFFERENCE
AMOUNT % AMOUNT %
C. TRUE-UP CALCULATION
1. JURISDICTIONAL FUEL REVENUE 37,311,034 38,468,108 (1,157,074) -3.0% 80,205,338 81,320,885 (1,115,547) -1.4%
2. FUEL ADJUSTMENT NOT APPLICABLE 0 0 0 0.0% 0 0 0 0.0%
2a. TRUE-UP PROVISION 10,219,983 10,219,983 0 0.0% 20,439,966 20,439,966 0 0.0%
2b. NCENTIVE PROVISION (80,799) (80,799) 0 0.0% (161,598) (161,598) 0 0.0%
2c. ADJUSTMENT 0 0 0 0.0% 0 0 0 0.0%
3. JURIS. FUEL REVENUE APPL. TO PERIOD 47,450,218 48,607,292 (1,157,074) -2.4% 100,483,706 101,599,253 (1,115,547) -1.1%
4. ADJ. TOTAL FUEL & NET PWR. TRANS. (LINE A7) 43,107,088 44,433,282 (1,326,194) -3.0% 93,194,049 95,001,407 (1,807,358) -1.9%
5. JURISDIC. SALES- % TOTAL MWH SALES (LINE B4) 1 0000000 0 9999385 0.0000615 0.0% - - - -
6. JURISDIC. TOTAL FUEL & NET PWR.TRANS. 43,107,088 44,430,549 (1,323,461) -3.0% 93,194,049 94,989,081 (1,795,032) -1.9%
6a. JURISDIC. LOSS MULT PLIER 1.00000 1.00002 (0.00002) 0.0% - - - -
6b. (L NE C6 x L NE C6a) 43,107,088 44,431,438 (1,324,350) -3.0% 93,194,049 94,990,981 (1,796,932) -1.9%
6c. ADJUSTMENT-DECEMBER 2016 JURISDIC LOSS MULTIPL ER (16) 0 (16) 0.0% (9,641) 0 (9,641) 0.0%
6d. JURISDIC. TOTAL FUEL & NET PWR 43,107,072 44,431,438 (1,324,366) -3.0% 93,184,408 94,990,981 (1,806,573) -1.9%
INCL. ALL ADJ (LNS. C6b+C6c)
7. TRUE-UP PROV. FOR MO. +/- COLLECTED 4,343,147 4,175,854 167,293 4.0% 7,299,298 6,608,272 691,026 10.5%
(LINE C3 - LINE C6d)
8. NTEREST PROVISION FOR THE MONTH 52,737 74,980 (22,243) -29.7% 112,173 154,540 (42,367) -27.4%
9. TRUE-UP & INT. PROV. BEG. OF MONTH 93,863,844 114,931,791 (21,067,947) -18.3% ----------------------------------------NOT APPLICABLE---------------------------------------
10. TRUE-UP COLLECTED (REFUNDED) (10,219,983) (10,219,983) 0 0.0% ----------------------------------------NOT APPLICABLE---------------------------------------
11. END OF PERIOD TOTAL NET TRUE-UP 88,039,745 108,962,642 (20,922,897) -19.2% ----------------------------------------NOT APPLICABLE--------------------------------------- (LINE C7 through C10)
ACTUAL ESTIMATED ACTUAL ESTIMATED
SCHEDULE A2PAGE 2 OF 3
CALCULATION OF TRUE-UP AND INTEREST PROVISIONTAMPA ELECTRIC COMPANY
MONTH OF February 2017
4
CURRENT MONTH PERIOD TO DATEDIFFERENCE DIFFERENCE
AMOUNT % AMOUNT %
D. INTEREST PROVISION
1. BEGINNING TRUE-UP AMOUNT 93,863,844 114,931,791 (21,067,947) -18.3% ----------------------------------------NOT APPLICABLE---------------------------------------
(LINE C9)
2. END NG TRUE-UP AMOUNT BEFORE NT. 87,987,008 108,887,662 (20,900,654) -19.2% ----------------------------------------NOT APPLICABLE---------------------------------------
(LINES C7 + C9 + C10)
3. TOTAL BEG. & END. TRUE-UP AMOUNT 181,850,852 223,819,453 (41,968,601) -18.8% ----------------------------------------NOT APPLICABLE---------------------------------------
4. AVG. TRUE-UP AMOUNT - (50% OF LINE D3) 90,925,426 111,909,727 (20,984,301) -18.8% ----------------------------------------NOT APPLICABLE---------------------------------------
5. NT. RATE-FIRST DAY REP. BUS. MONTH 0.740 0.800 (0.060) -7.5% ----------------------------------------NOT APPLICABLE---------------------------------------
6. NT. RATE-FIRST DAY SUBSEQUENT MONTH 0 640 0 800 (0.160) -20.0% ----------------------------------------NOT APPLICABLE---------------------------------------
7. TOTAL (LINE D5 + LINE D6) 1 380 1.600 (0.220) -13.8% ----------------------------------------NOT APPLICABLE---------------------------------------
8. AVERAGE INT. RATE (50% OF LINE D7) 0 690 0 800 (0.110) -13.8% ----------------------------------------NOT APPLICABLE---------------------------------------
9. MONTHLY AVG. INT. RATE (LINE D8/12) 0.058 0.067 (0.009) -13.4% ----------------------------------------NOT APPLICABLE---------------------------------------
10. NT. PROVISION (LINE D4 x LINE D9) 52,737 74,980 (22,243) -29.7% ----------------------------------------NOT APPLICABLE---------------------------------------
ESTIMATEDACTUAL ESTIMATED ACTUAL
SCHEDULE A2PAGE 3 OF 3
CALCULATION OF TRUE-UP AND INTEREST PROVISIONTAMPA ELECTRIC COMPANY
MONTH OF February 2017
5
GENERATING SYSTEM COMPARATIVE DATA BY FUEL TYPE
TAMPA ELECTRIC COMPANY MONTH OF February 2017
CURRENT MONTH PERIOD TO DATEDIFFERENCE DIFFERENCE
AMOUNT % AMOUNT %
FUEL COST OF SYSTEM NET GENERATION ($) 1 HEAVY OIL 0 0 0 0 0% 0 0 0 0.0% 2 LIGHT OIL 0 54,211 (54,211) -100 0% 0 106,166 (106,166) -100.0% 3 COAL 20,973,102 18,327,084 2,646,018 14.4% 45,069,069 42,279,851 2,789,218 6.6% 4 NATURAL GAS 20,325,136 24,299,192 (3,974,056) -16.4% 45,175,647 49,143,861 (3,968,214) -8.1% 5 NUCLEAR 0 0 0 0 0% 0 0 0 0.0% 6 OTHER 0 0 0 0 0% 0 0 0 0.0% 7 TOTAL ($) 41,298,238 42,680,487 (1,382,249) -3 2% 90,244,716 91,529,878 (1,285,162) -1.4%
SYSTEM NET GENERATION (MWH) 8 HEAVY OIL 0 0 0 0 0% 0 0 0 0.0% 9 LIGHT OIL 0 240 (240) -100 0% 0 460 (460) -100.0%10 COAL 679,495 600,450 79,045 13 2% 1,461,515 1,382,370 79,145 5.7%11 NATURAL GAS 580,005 679,870 (99,865) -14.7% 1,258,190 1,346,130 (87,940) -6.5%12 NUCLEAR 0 0 0 0 0% 0 0 0 0.0%13 OTHER 3,162 440 2,722 618 6% 3,652 890 2,762 310.3%14 TOTAL (MWH) 1,262,662 1,281,000 (18,338) -1.4% 2,723,357 2,729,850 (6,493) -0.2%
UNITS OF FUEL BURNED15 HEAVY OIL (BBL) 0 0 0 0 0% 0 0 0 0.0%16 LIGHT OIL (BBL) 0 440 (440) -100 0% 0 860 (860) -100.0%17 COAL (TON) 289,996 257,240 32,756 12.7% 616,100 595,290 20,810 3.5%18 NATURAL GAS (MCF) 4,413,807 4,785,900 (372,093) -7 8% 9,579,900 9,493,070 86,830 0.9%19 NUCLEAR (MMBTU) 0 0 0 0 0% 0 0 0 0.0%20 OTHER (MMBTU) 0 0 0 0 0% 0 0 0 0.0%
BTUS BURNED (MMBTU)21 HEAVY OIL 0 0 0 0 0% 0 0 0 0.0%22 LIGHT OIL 0 2,600 (2,600) -100 0% 0 5,040 (5,040) -100.0%23 COAL 7,252,300 6,172,520 1,079,780 17 5% 15,555,684 14,246,320 1,309,364 9.2%24 NATURAL GAS 4,519,738 4,895,090 (375,352) -7.7% 9,809,819 9,713,490 96,329 1.0%25 NUCLEAR 0 0 0 0 0% 0 0 0 0.0%26 OTHER 0 0 0 0 0% 0 0 0 0.0%27 TOTAL (MMBTU) 11,772,038 11,070,210 701,828 6 3% 25,365,503 23,964,850 1,400,653 5.8%
GENERATION MIX (% MWH)28 HEAVY OIL 0.00% 0.00% 0 00% 0 0% 0.00% 0 00% 0 00% 0.0%29 LIGHT OIL 0.00% 0.02% -0 02% -100 0% 0.00% 0 02% -0 02% -100.0%30 COAL 53.81% 46.87% 6 94% 14 8% 53.67% 50 64% 3 03% 6.0%31 NATURAL GAS 45.94% 53.07% -7.14% -13.4% 46.20% 49 31% -3.11% -6.3%32 NUCLEAR 0.00% 0.00% 0 00% 0 0% 0.00% 0 00% 0 00% 0.0%33 OTHER 0.25% 0.03% 0 22% 629.1% 0.13% 0 03% 0.10% 311.3%34 TOTAL (%) 100.00% 100.00% 0 00% 0 0% 100.00% 100 00% 0 00% 0.0%
FUEL COST PER UNIT35 HEAVY OIL ($/BBL) 0.00 0.00 0.00 0 0% 0.00 0.00 0.00 0.0%36 LIGHT OIL ($/BBL) 0.00 123.21 (123.21) -100 0% 0.00 123.45 (123.45) -100.0%37 COAL ($/TON) 72.32 71.25 1.08 1 5% 73.15 71.02 2.13 3.0%38 NATURAL GAS ($/MCF) 4.60 5.08 (0.47) -9 3% 4.72 5.18 (0.46) -8.9%39 NUCLEAR ($/MMBTU) 0.00 0.00 0.00 0 0% 0.00 0.00 0.00 0.0%40 OTHER ($/MMBTU) 0.00 0.00 0.00 0 0% 0.00 0.00 0.00 0.0%
FUEL COST PER MMBTU ($/MMBTU)41 HEAVY OIL 0.00 0.00 0.00 0 0% 0.00 0.00 0.00 0.0%42 LIGHT OIL 0.00 20.85 (20.85) -100 0% 0.00 21.06 (21.06) -100.0%43 COAL 2.89 2.97 (0.08) -2 6% 2.90 2.97 (0.07) -2.4%44 NATURAL GAS 4.50 4.96 (0.47) -9.4% 4.61 5.06 (0.45) -9.0%45 NUCLEAR 0.00 0.00 0.00 0 0% 0.00 0.00 0.00 0.0%46 OTHER 0.00 0.00 0.00 0 0% 0.00 0.00 0.00 0.0%47 TOTAL ($/MMBTU) 3.51 3.86 (0.35) -9 0% 3.56 3.82 (0.26) -6.8%
ACTUAL ESTIMATED ACTUAL ESTIMATED
SCHEDULE A3PAGE 1 OF 2
6
GENERATING SYSTEM COMPARATIVE DATA BY FUEL TYPE
TAMPA ELECTRIC COMPANY MONTH OF February 2017
CURRENT MONTH PERIOD TO DATEDIFFERENCE DIFFERENCE
AMOUNT % AMOUNT %
BTU BURNED PER KWH (BTU/KWH)48 HEAVY OIL 0 0 0 0 0% 0 0 0 0.0%49 LIGHT OIL 0 10,833 (10,833) -100 0% 0 10,957 (10,957) -100.0%50 COAL 10,673 10,280 393 3 8% 10,644 10,306 338 3.3%51 NATURAL GAS 7,793 7,200 593 8 2% 7,797 7,216 581 8.1%52 NUCLEAR 0 0 0 0 0% 0 0 0 0.0%53 OTHER 0 0 0 0 0% 0 0 0 0.0%54 TOTAL (BTU/KWH) 9,323 8,642 681 7 9% 9,314 8,779 535 6.1%
GENERATED FUEL COST PER KWH (cents/KWH)55 HEAVY OIL 0.00 0.00 0.00 0 0% 0.00 0.00 0.00 0.0%56 LIGHT OIL 0.00 22.59 (22.59) -100 0% 0.00 23.08 (23.08) -100.0%57 COAL 3.09 3.05 0.04 1 3% 3.08 3.06 0.02 0.7%58 NATURAL GAS 3.50 3.57 (0.07) -2 0% 3.59 3.65 (0.06) -1.6%59 NUCLEAR 0.00 0.00 0.00 0 0% 0.00 0.00 0.00 0.0%60 OTHER 0.00 0.00 0.00 0 0% 0.00 0.00 0.00 0.0%61 TOTAL (cents/KWH) 3.27 3.33 (0.06) -1 8% 3.31 3.35 (0.04) -1.2%
SCHEDULE A3PAGE 2 OF 2
ACTUAL ESTIMATED ACTUAL ESTIMATED
7
SYSTEM NET GENERATION AND FUEL COSTTAMPA ELECTRIC COMPANY
MONTH OF: February 2017
SCHEDULE A4PAGE 1 OF 1
(A) (B) (C) (D) (E) (F) (G) (H) (I) (J) (K) (L) (M) (N)
PLANT/UNIT
NETCAP-
ABILITY(MW)
NETGENERATION
(MWH)
NET CAPACITYFACTOR
(%)
NETAVAIL.
FACTOR(%)
NETOUTPUTFACTOR
(%)
AVG. NETHEAT RATEBTU/KWH
FUELTYPE
FUELBURNED(UNITS)
FUELHEAT VALUE(BTU/UNIT)
FUELBURNED
(MM BTU) (2 )
AS BURNEDFUEL COST
($) (1)
FUEL COSTPER KWH
(cents/KWH)
COST OFFUEL
($/UNIT)
TIA SOLAR 1.6 232 21.6 - 50.4 - SOLAR - - - - - -BIG BEND SOLAR (4) 18.0 2,743 22.7 - 57.5 - SOLAR - - - - - -LEGOLAND 1.5 187 18.6 - 41.8 - SOLAR - - - - - -SOLAR TOTAL 21.1 3,162 22.3 - 55.7 - SOLAR - - - - - -
B.B.#1 NAT GAS CO-FIRE 141 15,915 16.8 99.5 26.1 - NG CO-FIRE 180,381 1,024,000 184,710.0 830,577 5.22 4.60B.B.#1 COAL 395 151,428 57.0 99.5 57.0 - COAL 70,582 24,440,583 1,725,065.2 5,218,747 3.45 73.94BIG BEND #1 TOTAL 395 167,343 63.0 99.5 63.0 11,412 - - - 1,909,775.2 6,049,324 3.61 -B.B.#2 NAT GAS CO-FIRE 141 2,193 2.3 76.8 17.9 - NG CO-FIRE 24,060 1,024,000 24,637.0 110,784 5.05 4.60B.B.#2 COAL 395 150,559 56.7 76.8 65.4 - COAL 68,694 24,208,444 1,662,974.9 5,079,151 3.37 73.94BIG BEND #2 TOTAL 395 152,752 57.5 76.8 66.3 11,048 - - - 1,687,611.9 5,189,935 3.40 -B.B.#3 NAT GAS CO-FIRE 141 224 0.2 79.6 6.1 - NG CO-FIRE 2,135 1,024,000 2,186.0 9,830 4.39 4.60B.B.#3 COAL 400 50,479 18.8 79.6 57.9 - COAL 19,868 24,340,678 483,600.6 1,469,016 2.91 73.94BIG BEND #3 TOTAL 400 50,703 18.9 79.6 58.1 9,581 - - - 485,786.6 1,478,846 2.92 -B.B.#4 NAT GAS CO-FIRE 163 906 0.8 84.9 10.1 - NG CO-FIRE 9,372 1,024,000 9,597.0 43,154 4.76 4.60B.B.#4 COAL 442 189,167 63.7 84.9 73.5 - COAL 80,611 24,546,023 1,978,679.5 5,960,279 3.15 73.94BIG BEND #4 TOTAL 442 190,073 64.0 84.9 73.9 10,461 - - - 1,988,276.5 6,003,433 3.16 -B.B. IGNITION - - - - - - GAS 25,865 1,024,000 26,486.0 119,098 - 4.60BIG BEND 1-4 COAL TOTAL 1,632 541,633 49.4 85.2 64.5 10,801 COAL 239,755 24,401,244 5,850,320.2 17,727,193 3.27 73.94
B.B. CT#4 (OIL) 0 0 0.0 0.0 0.0 0 LGT.OIL 0 0 0.0 0 0.00 0.00B.B. CT#4 (GAS) 61 860 2.1 98.6 82.4 10,681 GAS 8,971 1,024,000 9,186.0 41,306 4.80 4.60BIG BEND CT #4 TOTAL 61 860 2.1 98.6 82.4 10,681 - - - 9,186.0 41,306 4.80 -
BIG BEND STATION TOTAL 1,693 561,731 49.4 85.6 66.8 10,825 - - - 6,080,636.2 18,881,942 3.36 -
POLK #1 GASIFIER 220 137,862 93.3 95.3 97.9 10,169 COAL 50,241 27,905,008 1,401,980.0 3,126,811 2.27 62.24POLK #1 CT (GAS) 195 5,747 4.4 99.3 30.3 8,380 GAS 47,029 1,024,000 48,158.0 216,550 3.77 4.60POLK #1 TOTAL 220 143,609 97.1 99.3 97.9 10,098 - - - 1,450,138.0 3,343,361 2.33 -
POLK #2 ST (3) 463 101,453 32.6 - 42.5 - - - - - - -
POLK #2 CT (GAS) 183 47,592 38.7 95.9 75.5 11,919 GAS 553,966 1,024,000 567,261.0 2,550,776 5.36 4.60POLK #2 CT (OIL) 187 0 0.0 95.9 0.0 0 LGT.OIL 0 0 0.0 0 0.00 0.00POLK #2 TOTAL 183 47,592 38.7 95.9 75.5 11,919 - - - 567,261.0 2,550,776 5.36 -
POLK #3 CT (GAS) 183 24,257 19.7 47.6 74.8 11,323 GAS 268,224 1,024,000 274,661.0 1,235,055 5.09 4.60POLK #3 CT (OIL) 187 0 0.0 47.6 0.0 0 LGT.OIL 0 0 0.0 0 0.00 0.00POLK #3 TOTAL 183 24,257 19.7 47.6 74.8 11,323 - - - 274,661.0 1,235,055 5.09 -
POLK #4 (GAS) 183 57,753 47.0 96.4 73.1 10,666 GAS 601,562 1,024,000 615,999.0 2,769,934 4.80 4.60
POLK #5 (GAS) 183 55,111 44.8 99.1 73.7 11,224 GAS 604,083 1,024,000 618,581.0 2,781,544 5.05 4.60
POLK #2 CC TOTAL 1,195 286,166 35.6 63.7 58.6 7,256 GAS - 1,024,000 2,076,502.0 9,337,309 3.26 -
POLK STATION TOTAL 1,415 429,775 45.2 69.3 67.7 8,206 - - - 3,526,640.0 12,680,670 2.95 -
BAYSIDE ST 1 243 42,933 26.3 99.4 38.2 - - - - - - -BAYSIDE CT1A 183 31,194 25.4 98.7 68.7 12,195 GAS 371,486 1,024,000 380,402.0 1,710,788 5.48 4.61BAYSIDE CT1B 183 45,482 37.0 92.6 64.2 12,973 GAS 576,222 1,024,000 590,051.0 2,653,649 5.83 4.61BAYSIDE CT1C 183 0 0.0 0.0 0.0 0 GAS 0 0 0.0 0 0.00 0.00BAYSIDE UNIT 1 TOTAL 792 119,609 22.5 80.9 32.6 8,114 GAS 947,708 1,024,000 970,453.0 4,364,437 3.65 4.61
BAYSIDE ST 2 315 50,397 23.8 48.6 53.6 - - - - - - -BAYSIDE CT2A 183 30,204 24.6 47.5 71.4 12,124 GAS 357,616 1,024,000 366,199.0 1,646,914 5.45 4.61BAYSIDE CT2B 183 18,074 14.7 46.4 71.6 12,122 GAS 213,958 1,024,000 219,093.0 985,332 5.45 4.61BAYSIDE CT2C 183 21,669 17.6 46.2 71.4 12,057 GAS 255,146 1,024,000 261,270.0 1,175,014 5.42 4.61BAYSIDE CT2D 183 25,757 20.9 47.8 67.1 12,409 GAS 312,125 1,024,000 319,616.0 1,437,416 5.58 4.61BAYSIDE UNIT 2 TOTAL 1,047 146,101 20.8 46.3 46.7 7,982 GAS 1,138,845 1,024,000 1,166,178.0 5,244,676 3.59 4.61
BAYSIDE UNIT 3 TOTAL 61 635 1.5 96.1 83.1 12,339 GAS 7,651 1,024,000 7,835.0 35,236 5.55 4.61BAYSIDE UNIT 4 TOTAL 61 883 2.2 100.0 90.7 11,778 GAS 10,156 1,024,000 10,400.0 46,772 5.30 4.61BAYSIDE UNIT 5 TOTAL 61 524 1.3 100.0 79.8 12,782 GAS 6,541 1,024,000 6,698.0 30,123 5.75 4.61BAYSIDE UNIT 6 TOTAL 61 242 0.6 100.0 65.0 13,215 GAS 3,123 1,024,000 3,198.0 14,382 5.94 4.61
BAYSIDE STATION TOTAL 2,083 267,994 19.1 65.6 39.3 8,078 GAS 2,114,024 1,024,000 2,164,762.0 9,735,626 3.63 4.61
B.B. IGNITION LGT.OIL 0
SYSTEM 5,212 1,262,662 36.0 72.9 58.4 9,323 - - - 11,772,038.2 41,298,238 3.27 -
Footnotes: (1) As burned fuel cost system total includes ignition and excludes the Polk warm gas cleanup credit.(2) Fuel burned (MM BTU) system total excludes ignition.(3) Polk #2 ST commenced commercial operation on January 16, 2017.
LEGEND: (4) Big Bend solar commenced commercial operation on February 10, 2017. B.B. BIG BEND NG NATURAL GAS CC COMBINED CYCLE
CT COMBUSTION TURBINE ST STEAM
8
SYSTEM GENERATED FUEL COSTINVENTORY ANALYSIS
TAMPA ELECTRIC COMPANYMONTH OF February 2017
CURRENT MONTH PERIOD TO DATEDIFFERENCE DIFFERENCE
AMOUNT % AMOUNT %
HEAVY OIL 1 PURCHASES:
2 UNITS (BBL) 0 0 0 0.0% 0 0 0 0.0%
3 UNIT COST ($/BBL) 0.00 0 00 0 00 0.0% 0.00 0.00 0.00 0.0%
4 AMOUNT ($) 0 0 0 0.0% 0 0 0 0.0% 5 BURNED:
6 UNITS (BBL) 0 0 0 0.0% 0 0 0 0.0%
7 UNIT COST ($/BBL) 0.00 0 00 0 00 0.0% 0.00 0.00 0.00 0.0%
8 AMOUNT ($) 0 0 0 0.0% 0 0 0 0.0% 9 ENDING INVENTORY:
10 UNITS (BBL) 0 0 0 0.0% 0 0 0 0.0%
11 UNIT COST ($/BBL) 0.00 0 00 0 00 0.0% 0.00 0.00 0.00 0.0%
12 AMOUNT ($) 0 0 0 0.0% 0 0 0 0.0%13
14 DAYS SUPPLY: 0 0 0 0.0% - - - -
LIGHT OIL(1)
15 PURCHASES:
16 UNITS (BBL) 0 440 (440) -100.0% 0 860 (860) -100.0%
17 UNIT COST ($/BBL) 0.00 73.11 (73.11) -100.0% 0.00 72.95 (72.95) -100.0%
18 AMOUNT ($) 0 32,170 (32,170) -100.0% 0 62,734 (62,734) -100.0%19 BURNED:
20 UNITS (BBL) 0 440 (440) -100.0% 0 860 (860) -100.0%
21 UNIT COST ($/BBL) 0.00 123 21 (123 21) -100.0% 0 00 123.45 (123.45) -100.0%
22 AMOUNT ($) 0 54,211 (54,211) -100.0% 0 106,166 (106,166) -100.0%23 ENDING INVENTORY:
24 UNITS (BBL) 44,488 44,488 0 0.0% 44,488 44,488 0 0.0%
25 UNIT COST ($/BBL) 127.48 123 21 4 28 3.5% 127.48 123.21 4.28 3.5%
26 AMOUNT ($) 5,671,463 5,481,224 190,239 3.5% 5,671,463 5,481,224 190,239 3.5%27
28 DAYS SUPPLY: NORMAL 3,274 3,274 0 0.0% - - - -
29 DAYS SUPPLY: EMERGENCY 6 6 0 0.0% - - - -
COAL(2)
30 PURCHASES:
31 UNITS (TONS) 263,607 253,333 10,274 4.1% 494,704 536,676 (41,972) -7.8%
32 UNIT COST ($/TON) 73.26 74 59 (1 33) -1.8% 77 80 73.40 4.40 6.0%
33 AMOUNT ($) 19,312,768 18,896,679 416,089 2.2% 38,486,852 39,389,389 (902,537) -2.3%34 BURNED:
35 UNITS (TONS) 289,996 257,240 32,756 12.7% 616,100 595,290 20,810 3.5%
36 UNIT COST ($/TON) 72.32 71 25 1 08 1.5% 73.15 71.02 2.13 3.0%
37 AMOUNT ($) 20,973,102 18,327,084 2,646,018 14.4% 45,069,069 42,279,851 2,789,218 6.6%38 ENDING INVENTORY:
39 UNITS (TONS) 206,309 417,823 (211,514) -50.6% 206,309 417,823 (211,514) -50.6%
40 UNIT COST ($/TON) 72.93 64 98 7 95 12.2% 72 93 64.98 7.95 12.2%
41 AMOUNT ($) 15,045,585 27,149,491 (12,103,906) -44.6% 15,045,585 27,149,491 (12,103,906) -44.6%42
43 DAYS SUPPLY: 20 40 (20) -50.0% - - - -
NATURAL GAS (3)
44 PURCHASES:
45 UNITS (MCF) 4,536,743 4,785,900 (249,157) -5.2% 9,472,662 9,493,070 (20,408) -0.2%
46 UNIT COST ($/MCF) 4.60 5.10 (0 50) -9.7% 4.78 5.21 (0.43) -8.3%
47 AMOUNT ($) 20,888,335 24,408,980 (3,520,645) -14.4% 45,264,741 49,476,607 (4,211,866) -8.5%48 BURNED:
49 UNITS (MCF) 4,413,807 4,785,900 (372,093) -7.8% 9,579,900 9,493,070 86,830 0.9%
50 UNIT COST ($/MCF) 4.60 5 08 (0.47) -9.3% 4.72 5.18 (0.46) -8.9%
51 AMOUNT ($) 20,325,136 24,299,192 (3,974,056) -16.4% 45,175,647 49,143,861 (3,968,214) -8.1%
52 ENDING INVENTORY:
53 UNITS (MCF) 861,593 875,486 (13,893) -1.6% 861,593 875,486 (13,893) -1.6%
54 UNIT COST ($/MCF) 3.09 3 50 (0.42) -11.9% 3.09 3.50 (0.42) -11.9%
55 AMOUNT ($) 2,659,195 3,067,020 (407,825) -13.3% 2,659,195 3,067,020 (407,825) -13.3%56
57 DAYS SUPPLY: 4 4 0 0.0% - - - -
NUCLEAR58 BURNED:59 UNITS (MMBTU) 0 0 0 0.0% 0 0 0 0.0%60 UNIT COST ($/MMBTU) 0.00 0 00 0 00 0.0% 0.00 0.00 0.00 0.0%61 AMOUNT ($) 0 0 0 0.0% 0 0 0 0.0%
SCHEDULE A5PAGE 1 OF 2
ACTUAL ESTIMATEDACTUAL ESTIMATED
9
SYSTEM GENERATED FUEL COSTINVENTORY ANALYSIS
TAMPA ELECTRIC COMPANYMONTH OF February 2017
CURRENT MONTH PERIOD TO DATEDIFFERENCE DIFFERENCE
AMOUNT % AMOUNT %
OTHER62 PURCHASES:63 UNITS (MMBTU) 0 0 0 0.0% 0 0 0 0.0%64 UNIT COST ($/MMBTU) 0.00 0 00 0 00 0.0% 0.00 0.00 0.00 0.0%65 AMOUNT ($) 0 0 0 0.0% 0 0 0 0.0%66 BURNED:67 UNITS (MMBTU) 0 0 0 0.0% 0 0 0 0.0%68 UNIT COST ($/MMBTU) 0.00 0 00 0 00 0.0% 0.00 0.00 0.00 0.0%69 AMOUNT ($) 0 0 0 0.0% 0 0 0 0.0%70 ENDING INVENTORY:71 UNITS (MMBTU) 0 0 0 0.0% 0 0 0 0.0%72 UNIT COST ($/MMBTU) 0.00 0 00 0 00 0.0% 0.00 0.00 0.00 0.0%73 AMOUNT ($) 0 0 0 0.0% 0 0 0 0.0%
74 DAYS SUPPLY: 0 0 0 0.0% - - - -
(1)RECONCILIATION - LIGHT OIL DIFFERENCE N ENDING INVENTORY UNITS AND DOLLARS DUE TO:
UNITS DOLLARSBB GYPSUM 0 0BB COAL FIELD 0 0BB OTHER PLANT 0 0PK OTHER PLANT 0 0 TOTAL 0 0
(2)RECONCILIATION - COAL DIFFERENCE N ENDING INVENTORY DOLLARS DUE TO:
DOLLARS FUEL ANALYSIS 26,834 NON- NV EXPENSE 704,580 BIG BEND #2 IGNITION 0 BIG BEND NG IGNITION 119,098 POLK NG IGNITION 2,833 AERIAL SURVEY ADJ (635,479) ADDITIVES 0 TOTAL 217,866
(3)RECONCILIATION - NATURAL GAS DIFFERENCE N ENDING INVENTORY DOLLARS DUE TO:
UNITS DOLLARS ADDITIVES 0 BIG BEND NG IGNITION (119,098) POLK NG IGNITION (2,833) NVENTORY ADJ 0 2,832 TOTAL 0 (119,099)
SCHEDULE A5PAGE 2 OF 2
ACTUAL ESTIMATED ACTUAL ESTIMATED
10
POWER SOLDTAMPA ELECTRIC COMPANY
MONTH OF: February 2017
(1) (2) (3) (4) (5) (6) (7) (8) (9)
CENTS/KWH
SOLD TO
TOTALMWHSOLD
MWHWHEELED
OTHERSYSTEM
MWHFROM OWN
GENERATION
(A)FUELCOST
(B)TOTALCOST
TOTAL $FOR FUEL
ADJUSTMENT(5)X(6A)
TOTAL $FOR TOTAL
COST(5)X(6B)
GAINS ON MARKET
BASED SALES
ESTIMATED:
SEMINOLE JURISD. SCH. - D 680.0 0.0 680.0 2.803 2.911 19,060.00 19,794.00 734.00
VARIOUS JURISD. MKT.BASE 990.0 0.0 990.0 2.695 2.965 26,679.15 29,350.00 2,670.85
TOTAL 1,670.0 0.0 1,670.0 2.739 2.943 45,739.15 49,144.00 3,404.85
ACTUAL:
SEMINOLE ELEC. PRECO-1 JURISD. SCH. - D 232.0 0.0 232.0 2.027 2.230 4,702.30 5,172.53 307.32
DUKE ENERGY FLORIDA SCH. - CB 1,005.0 0.0 1,005.0 2.356 2.568 23,677.80 25,808.40 0.00
REEDY CREEK SCH. - CB 4,151.0 0.0 4,151.0 1.938 2.327 80,439.15 96,592.17 8,512.95
DUKE ENERGY FLORIDA SCH. - MA 2,338.0 0.0 2,338.0 1.957 2.185 45,754.52 51,087.76 105.66
ORLANDO UTILITIES SCH. - MA 1,265.0 0.0 1,265.0 1.978 2.382 25,017.55 30,131.51 2,342.51
SEMINOLE ELECTRIC SCH. - MA 650.0 0.0 650.0 1.957 2.587 12,721.50 16,812.69 2,934.69
THE ENERGY AUTHORITY SCH. - MA 40.0 0.0 40.0 1.995 2.572 798.15 1,028.97 144.57
EDF TRADING SCH. - MA 120.0 0.0 120.0 2.359 2.979 2,831.05 3,575.32 483.87
MORGAN STANLEY SCH. - MA 150.0 0.0 150.0 2.271 3.445 3,406.50 5,168.04 1,436.04
LESS 20% - THRESHOLD EXCESS SCH. - D 0.00
LESS 20% - THRESHOLD EXCESS SCH. - C 0.00
LESS 20% - THRESHOLD EXCESS SCH. - CB 0.00
LESS 20% - THRESHOLD EXCESS SCH. - MA 0.00
SUB-TOTAL CURRENT MONTH 9,951.0 0.0 9,951.0 2.003 2.365 199,348.52 235,377.39 16,267.61
ADJUSTMENTS TO PRIOR MONTHS:
REEDY CREEK Dec. 2016 SCH. - CB (2,939.0) 0.0 (2,939.0) 2.094 2.495 (61,535.62) (73,326.71) (5,827.54)
REEDY CREEK Dec. 2016 SCH. - CB 2,939.0 0.0 2,939.0 2.095 2.496 61,573.38 73,364.47 5,827.54
SUB-TOTAL ADJUSTMENTS 0.0 0.0 0.0 0.000 0.000 37.76 37.76 0.00
SUB-TOTAL SCHEDULE D POWER SALES-JURISD. 232.0 0.0 232.0 2.027 2.230 4,702.30 5,172.53 307.32
SUB-TOTAL SCHEDULE C POWER SALES 0.0 0.0 0.0 0.000 0.000 0.00 0.00 0.00
SUB-TOTAL SCHEDULE CB POWER SALES 5,156.0 0.0 5,156.0 2.020 2.375 104,154.71 122,438.33 8,512.95
SUB-TOTAL SCHEDULE MA POWER SALES-JURISD. 4,563.0 0.0 4,563.0 1.984 2.363 90,529.27 107,804.29 7,447.34
SUB-TOTAL OATT POWER SALES 0.0 0.0 0.0 0.000 0.000 0.00 0.00 0.00
TOTAL 9,951.0 0.0 9,951.0 2.004 2.366 199,386.28 235,415.15 16,267.61
CURRENT MONTH:
DIFFERENCE 8,281.0 0.0 8,281.0 (0.735) (0.577) 153,647.13 186,271.15 12,862.76
DIFFERENCE % 495.9% 0.0% 495.9% -26.8% -19.6% 335.9% 379.0% 377.8%
PERIOD TO DATE:
ACTUAL 23,745.0 0.0 23,745.0 2.213 2.848 525,487.63 676,310.65 101,529.12
ESTIMATED 3,410.0 0.0 3,410.0 2.731 2.929 93,117.58 99,874.00 6,756.42
DIFFERENCE 20,335.0 0.0 20,335.0 (0.518) (0.081) 432,370.05 576,436.65 94,772.70
DIFFERENCE % 596.3% 0.0% 596.3% -19.0% -2.8% 464.3% 577.2% 1402.7%
TYPE&
SCHEDULE
SCHEDULE A6PAGE 1 OF 1
11
PURCHASED POWER(EXCLUSIVE OF ECONOMY & COGENERATION)
TAMPA ELECTRIC COMPANYMONTH OF February 2017
(1) (2) (3) (4) (5) (6) (7) (8)
CENTS/KWH
PURCHASED FROM
TOTALMWH
PURCHASED
MWHFROMOTHER
UTILITIES
MWHFOR
INTER-RUPTIBLE
MWHFORFIRM
(A)FUELCOST
(B)TOTALCOST
TOTAL $FOR FUEL
ADJUSTMENT(6)X(7A)
ESTIMATED
PASCO COGEN SCH. - D 0.0 0 0 0.0 0.0 0.000 0.000 0.00
TOTAL 0.0 0.0 0.0 0.0 0.000 0.000 0.00
ACTUAL
PASCO COGEN SCH. - D 5,502.0 0 0 0.0 5,502.0 3.879 3.879 213,401.11
DUKE ENERGY FLORIDA SCH. - D 0.0 0 0 0.0 0.0 0.000 0.000 0.00
DUKE ENERGY FLORIDA OATT 479.0 0 0 0.0 479.0 2.119 2.119 10,151.76
CALPINE TECM OATT 0.0 0 0 0.0 0.0 0.000 0.000 0.00
CALPINE OSPREY OATT 0.0 0 0 0.0 0.0 0.000 0.000 0.00
SUB-TOTAL CURRENT MONTH 5,981.0 0.0 0.0 5,981.0 3.738 3.738 223,552.87
NO ADJUSTMENTS TO PRIOR MONTHS
SUB-TOTAL SCHEDULE D PURCHASED POWER 5,502.0 0 0 0.0 5,502.0 3.879 3.879 213,401.11
SUB-TOTAL SCHEDULE OATT PURCHASED POWER 479.0 0 0 0.0 479.0 2.119 2.119 10,151.76
TOTAL 5,981.0 0.0 0.0 5,981.0 3.738 3.738 223,552.87
CURRENT MONTH
DIFFERENCE 5,981.0 0 0 0.0 5,981.0 3.738 3.738 223,552.87
DIFFERENCE % 0.0% 0.0% 0 0% 0 0% 0.0% 0.0% 0.0%
PERIOD TO DATE
ACTUAL 16,057.0 0 0 0.0 16,057.0 3.487 3.487 559,956.53
ESTIMATED 0.0 0 0 0.0 0.0 0.000 0.000 0.00
DIFFERENCE 16,057.0 0 0 0.0 16,057.0 3.487 3.487 559,956.53
DIFFERENCE % 0.0% 0.0% 0 0% 0 0% 0.0% 0.0% 0.0%
SCHEDULE A7PAGE 1 OF 1
TYPE&
SCHEDULE
12
.ENERGY PAYMENT TO QUALIFYING FACILITIES
TAMPA ELECTRIC COMPANYMONTH OF February 2017
(1) (2) (3) (4) (5) (6) (7) (8)
CENTS/KWH
PURCHASED FROM
TYPE&
SCHEDULE
TOTALMWH
PURCHASED
MWHFROMOTHER
UTILITIES
MWHFOR
INTER-RUPTIBLE
MWHFORFIRM
(A)FUELCOST
(B)TOTALCOST
TOTAL $FOR FUEL
ADJUSTMENT(6)X(7A)
ESTIMATEDVARIOUS COGEN.
AS AVAIL. 7,440 0 0.0 0.0 7,440.0 2.961 2.961 220,310 00TOTAL 7,440.0 0.0 0.0 7,440.0 2.961 2.961 220,310.00
ACTUAL
AS AVAILABLE
McKAY BAY REFUSE COGEN. 3 0 0.0 0.0 3.0 2.158 2.158 64.75
CARGILL RIDGEWOOD COGEN. 0 0 0.0 0.0 0.0 0.000 0.000 0 00
CARGILL GREEN BAY COGEN. 0 0 0.0 0.0 0.0 0.000 0.000 0 00
CARGILL MILLPOINT COGEN. 4,835 0 0.0 0.0 4,835.0 2.046 2.046 98,948 09
CF INDUSTRIES INC. COGEN. 410 0 0.0 0.0 410.0 2.045 2.045 8,384 04
IMC-AGRICO-NEW WALES COGEN. 145 0 0.0 0.0 145.0 2.040 2.040 2,958.47
IMC-AGRICO-S. P ERCE COGEN. 9,038 0 0.0 0.0 9,038.0 2.053 2.053 185,578 92
HILLSBOROUGH COUNTY COGEN. 33 0 0.0 0.0 33.0 2.032 2.032 670 65
SUB-TOTAL CURRENT MONTH 14,464.0 0.0 0.0 14,464.0 2.051 2.051 296,604.92
ADJUSTMENTS TO PRIOR MONTHS
McKAY BAY REFUSE Jan. 2017 COGEN. (3 0) 0.0 0.0 (3.0) 2.137 2.137 (64.10)
McKAY BAY REFUSE Jan. 2017 COGEN. 3 0 0.0 0.0 3.0 2.133 2.133 63.98
CARGILL MILLPOINT Jan. 2017 COGEN. (2,851 0) 0.0 0.0 (2,851.0) 2.109 2.109 (60,135.71)
CARGILL MILLPOINT Jan. 2017 COGEN. 2,851 0 0.0 0.0 2,851.0 2.108 2.108 60,094.38
CF INDUSTRIES INC. Jan. 2017 COGEN. (349 0) 0.0 0.0 (349.0) 2.139 2.139 (7,464 35)
CF INDUSTRIES INC. Jan. 2017 COGEN. 349 0 0.0 0.0 349.0 2.137 2.137 7,459.21
IMC-AGRICO-NEW WALES Jan. 2017 COGEN. (101 0) 0.0 0.0 (101.0) 1.985 1.985 (2,004 86)
IMC-AGRICO-NEW WALES Jan. 2017 COGEN. 101 0 0.0 0.0 101.0 1.984 1.984 2,003.48
IMC-AGRICO-S. P ERCE Jan. 2017 COGEN. (16,220 0) 0.0 0.0 (16,220.0) 2.106 2.106 (341,654 01)
IMC-AGRICO-S. P ERCE Jan. 2017 COGEN. 16,220 0 0.0 0.0 16,220.0 2.105 2.105 341,419.19
HILLSBOROUGH COUNTY Jan. 2017 COGEN. (8 0) 0.0 0.0 (8.0) 2.187 2.187 (174 99)
HILLSBOROUGH COUNTY Jan. 2017 COGEN. 8 0 0.0 0.0 8.0 2.184 2.184 174 68
SUB-TOTAL ADJUSTMENTS 0.0 0.0 0.0 0.0 0.000 0.000 (283.10)
SUB-TOTAL FOR AS AVAIL. 14,464.0 0.0 0.0 14,464.0 2.049 2.049 296,321.82
NET METERING FOR 2016 2,180.0 0.0 0.0 2,180.0 2.194 2.194 47,832.71
TOTAL INCL NET METERING 16,644.0 0.0 0.0 16,644.0 2.068 2.068 344,154.53
CURRENT MONTH
DIFFERENCE 9,204 0 0.0 0.0 9,204.0 (0.893) (0.893) 123,844 53
DIFFERENCE % 123.7% 0 0% 0.0% 123.7% -30 2% -30 2% 56 2%
PERIOD TO DATE
ACTUAL 36,176 0 0.0 0.0 36,176.0 2.089 2.089 755,652 55
EST MATED 14,980 0 0.0 0.0 14,980.0 3.245 3.245 486,050 00
DIFFERENCE 21,196 0 0.0 0.0 21,196.0 (1.156) (1.156) 269,602 55
DIFFERENCE % 141.5% 0 0% 0.0% 141.5% -35 6% -35 6% 55 5%
SCHEDULE A8PAGE 1 OF 1
13
ECONOMY ENERGY PURCHASESTAMPA ELECTRIC COMPANY
MONTH OF: February 2017
(1) (2) (3) (4) (5) (6) (7)(8)
COST IF GENERATED (9)
PURCHASED FROM
TYPE&
SCHEDULE
TOTALMWH
PURCHASED
MWH FOR
INTERRUP-TIBLE
MWH FORFIRM
TRANSACTIONCOSTS
CENTS/KWH
TOTAL $FOR FUEL
ADJUSTMENT(5) X (6)
(A)CENTS
PER KWH
(B)
TOTALCOST
FUELSAVINGS
(8B)-7
ESTIMATED:
VARIOUS Economy 26,580.0 0.0 26,580.0 3.120 829,340.00 3.120 829,340.00 0.00
TOTAL 26,580.0 0.0 26,580.0 3.120 829,340.00 3.120 829,340.00 0.00
ACTUAL:
FLA. POWER & LIGHT SCH. - J 16,540.0 0.0 16,540.0 2.993 494,960.00 3.287 543,627.45 48,667.45
ORLANDO UTIL. COMM. SCH. - J 350.0 0.0 350.0 3.243 11,350.00 3.855 13,492.50 2,142.50
CARGILL ALLIANT SCH. - J 1,152.0 0.0 1,152.0 3.250 37,440.00 3.499 40,308.48 2,868.48
SEMINOLE ELEC. CO-OP SCH. - J 2,785.0 0.0 2,785.0 2.748 76,535.00 3.068 85,449.90 8,914.90
EDF TRADING SCH. - J 1,737.0 0.0 1,737.0 2.690 46,725.00 3.448 59,888.76 13,163.76
EXGEN SCH. - J 237.0 0.0 237.0 3.000 7,110.00 3.977 9,426.48 2,316.48
SOUTHERN COMPANY SCH. - J 1,077.0 0.0 1,077.0 2.821 30,387.00 3.688 39,719.25 9,332.25
SUB-TOTAL CURRENT MONTH 23,878.0 0.0 23,878.0 2.950 704,507.00 3.316 791,912.82 87,405.82
NO ADJUSTMENTS TO PRIOR MONTHS
SUB-TOTAL SCHEDULE REB ECONOMY PURCHASES 0.0 0.0 0.0 0.000 0.00 0.000 0.00 0.00
SUB-TOTAL SCHEDULE C ECONOMY PURCHASES 0.0 0.0 0.0 0.000 0.00 0.000 0.00 0.00
SUB-TOTAL SCHEDULE J ECONOMY PURCHASES 23,878.0 0.0 23,878.0 2.950 704,507.00 3.316 791,912.82 87,405.82
TOTAL 23,878.0 0.0 23,878.0 2.950 704,507.00 3.316 791,912.82 87,405.82
CURRENT MONTH:
DIFFERENCE (2,702.0) 0.0 (2,702.0) (0.170) (124,833.00) 0.196 (37,427.18) 87,405.82
DIFFERENCE % -10.2% 0.0% -10.2% -5.4% -15.1% 6.3% -4.5% 0.0%
PERIOD TO DATE:
ACTUAL 25,298.0 0.0 25,298.0 2.971 751,567.00 3.338 844,461.62 92,894.62
ESTIMATED 50,420.0 0.0 50,420.0 3.126 1,576,180.00 3.126 1,576,180.00 0.00
DIFFERENCE (25,122.0) 0.0 (25,122.0) (0.155) (824,613.00) 0.212 (731,718.38) 92,894.62
DIFFERENCE % -49.8% 0.0% -49.8% -5.0% -52.3% 6.8% -46.4% 0.0%
SCHEDULE A9PAGE 1 OF 1
14
CONTRACTCONTRACT START END TYPE
DUKE ENERGY FLOR DA 2/1/2016 2/28/2017 LT QF = QUALIFYING FACILITY
PASCO COGEN LTD 1/1/2009 12/31/2018 LT LT = LONG TERM
SEM NOLE ELECTRIC ** 6/1/1992 ----------- LT ST = SHORT-TERM
** THREE YEAR NOTICE REQUIRED FOR TERMINATION.
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBERCONTRACT MW MW MW MW MW MW MW MW MW MW MW MW
DUKE ENERGY FLOR DA 250.0 250.0
PASCO COGEN LTD 121.0 121.0
SEM NOLE ELECTRIC 0.4 0.6
CAPACITY JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER TOTAL($) ($) ($) ($) ($) ($) ($) ($) ($) ($) ($) ($) ($)
TOTAL PURCHASES AND (SALES) 2,213,725$ 391,435$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2,605,160$
TOTAL CAPACITY 2,213,725$ 391,435$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2,605,160$
SCHEDULE A12PAGE 1 OF 1
CAPACITY COSTSACTUAL PURCHASES AND SALES
TAMPA ELECTRIC COMPANYMONTH OF February 2017
TERM
15
LIST OF ACRONYMSTAMPA ELECTRIC COMPANY
ACRONYM DESCRIPTION
ROI Return on InvestmentWGC Warm Gas CleanupOATT Open Access Transmission TariffT&D Transmission & DistributionGPIF Generating Performance Incentive Factor
PAGE 1 OF 1
16
McMullen, Enemies of the Roman Order
John McMullen A Supplement for Fuzion
AUSLEY MCMULLEN - psc.state.fl.us value of net benefits to the utility from this program was projected ... 3228.3 141.6 4653.9 144.6 6892.5 300.1 ... I' I>ESCIUPTION 01' PI!OGIMM:
MCMULLEN COUNTY PERSONNEL POLICY MANUAL· 2017-09-22· MCMULLEN COUNTY . POLICY ON NEPOTISM . HIRING OF 1.Texas Government Code Chapter 573, a Public Official of McMullen . RELATIVES
Presenters: Steve Gigliotti Laura McMullen Marcus Smith
The Honorable John M. McMullen Judge...· The Honorable John M. McMullen ... Denver, Co. 80202 Dear Judge McMullen: ... John N. McMullen All District Judges All Trial Judges
ECE 4884: Senior Design Project Satya Bhan Andrew Ausley Michael Moseley 1
2013 McMullen Naval History Symposium
McMullen Wedding Session
Presenter: Laura McMullen August Supervisory Sweeps
8 - McMullen and Schopf Concrete Pavement Awards Presentation
Measures of Intelligences IQ Therese McMullen Anna Yiantsos
The McMullen Roadster
AUSLEY MCMULLEN· 6. Tampa Electric proposes to offer the EV curriculum under this portion of the Program in the fall semester of2017 with one high school and to then expand the
Mrs. Marcantonio and Mrs. McMullen
AUSLEY MCMULLEN ATTORNEYS AND COUNSELORS AT LAW …· 2017-04-04· Ms . Carlotta S. Stauffer Commission Clerk AUSLEY MCMULLEN ATTORNEYS AND COUNSELORS AT LAW 123 SOUTH CALHOUN
Mitchell McMullen Paul Nguyen
McMullen News Bulletin Spring 2016
AUSLEY MCMULLEN Electric Company Ten-Year Site Plan For Electrical Generating Facilities and Associated Transmission Lines January 2016 to December 2025
LightSaVers Satya Bhan Andrew Ausley Michael Moseley 1
AUSLEY MCMULLEN - Florida Public Service Commission· ausley mcmullen attorneys and counselors at law 1.23 south cal houn street p .o. box 391 (zip 3.2302) tallahassee. florida 32301
K McMullen Digital Portfolio 2016
Roger B. McMullen Roger B. McMullen Co-Inventor: MPAT McMULLEN PROCESS E-mail: [emailprotected] Cell-Panama: 507-6-528-4167
AusLEY McMuLLEN ATTORNEYS AND COUNSELORS AT LAW …ausley mcmullen attorneys and counselors at law 123 south calhoun street p.o. box 391 (zip 32302) tallahassee, florida 32301 (850)
Maths Methods Trigonometric equations K McMullen 2012
Medical Evacuation Network Project LT McMullen LT Dunham
Soci 4385 mcmullen fall15 cli
McMullen v. Hoffman, 174 U.S. 639 (1899)
Ken mcmullen
Chris McMullen Scores a Saw Point - The Classic Yacht ...· Chris McMullen Scores a Saw Point Chris McMullen Photo By Nathan Herbert Chris McMullen’s workshop is like many others
Sula Satori, Merlot, India Rose Wines Sula Rose, Zinfandel, India India 1050 850 850 850 850 650 650 850 850 850 850 850 650 550 As Per excise regulations we are not permitted to